Mesh Screen

A fast and effective method of containing debris and other materials on your site, and of protecting passers-by. With an in-built toeboard, the screen can be securely attached to already installed scaffolding or edge protection using the INTAKS Mesh Screen Hook and/or cable ties.

Installation process

Mesh Screens are put in place after completion of the edge protection installation:

  1. Position Mesh Screen on inside of handrails and secure to the handrails using Mesh Screen Hook(s) and/or cable ties. Appropriate method for securing Mesh Screen to handrails will depend on site requirements. Screen can be locked onto the Mesh Screen Hook using a Lock Pin & R-Clip, if required.
  2. Mesh Screens may be lapped where required.
  3. If the Mesh Screen is also intended to function as a toeboard, Toeboard Floor Clips or similar restraining blocks should be positioned on the outside edge of the Mesh Screen and secured to the surface whose edge is being protected. This prevents undue outward deflection of the Mesh Screen.
  4. Dismantle process is the reverse to the install process.

Components

Components easily fit together allowing for rapid install:

  • Mesh Screen (part #1301)
  • Mesh Screen Hook (part #1234) and/or cable ties
  • Lock Pins (part #1182)
  • R-Clips (part #1900)

Scaffold / edge protection equipment & solutions

Please fill out the form below